We have mixed feelings about being in built up areas, sometimes they appeal and other times we yearn for the countryside. And having explored Birmingham last January the busyness of the Easter Bank Holiday encouraged us to move on after only one night.
Last year we had travelled into Birmingham on the Old Line, so this time we decided to explore a new route and leave on the New Main line

The two lines run parallel to each other for quite a stretch,

The advantage being that the improved new mainline tackles the summit with a tunnel instead of 6 locks, making it a much quicker and easier passage for the barges.

And also reducing the workload for the Smethwick pumping station

And whilst I’m sure they weren’t built at the same time, the M5 motorway provides a canopy over the Old line for quite a section, whereas the New line creeps underneath the two, although you cant see it, there’s also a railway line crossing at the same point.

Last January we had taken 3 days to do this journey on the Old Line it was cold and bitter and section’s of the canal were still frozen. This time we had reached the Netherton tunnel branch in 3 hours.

And we were able to moor up in the very pretty and peaceful Bumblehole













