With all our commitments complete, it was time to consider our cruising plans. We’d like to explore East Anglia next summer, which means moving south. CRT”s planned winter maintenance on the locks around Etruria meant we needed to off the Macc and beyond that point by New Year. Or we’d get caught by the stoppage till end of January. Fate had other plans. Making good progress, we stopped off in Macclesfield on 13th December to pick up provisions, only to recieve the notification that same day that there was a leaking culvert at Kents Green Bridge, (South of Congleton). Stop planks had been installed to stop the leak and navigation was closed from the Bosley locks. But was it fate? If we had been one day earlier, we would have been stranded on a rural section with no facilities nearby to keep us fed and watered. Updates were promised on the 18th December so we sort permission to overstay on the Macclesfield pontoon. A friend sent us this image from a FB post, it didnt look good.

With some potentially some grim cold, wet and windy weather on its way, we already knew in our hearts that the likelihood of the repair being complete was slim. Although technically possible to cruise 20 or so miles in 2 days to reach Etruria, it wasn’t going to be a fun challenge. We braced ourselves for the worst scenario. We were stuck. Instead of feeling glum, we made the most of Macclesfield and set about decorating the boat for Christmas.

And I took advantage of the quick train into Manchester to meet up with Mum and Aunty for the day.

The promised update arrived on the 18th and alas as we feared, the repair was still ongoing. Our decision was made: we’d turn around and stay put -OK not actually stay put, but stay north of Macclesfield on the Macc and Peak Forest canals until we were able to cruise freely at our own pace. Even if that wouldn’t be until February. We considered the practicality of buying ourselves a house, this one had a certain appeal.

But first, Christmas in Bollington. A place we always enjoy returning to.

We were lucky to get a mooring on the aqueduct looking towards Clarence Mill. Although the view wasn’t always quite this tranquil as storms hit us and most of our 14 day stay was wet and windy, though thankfully not cold. And whilst we didn’t see that much sun, we did enjoy another spectacular moonbow

We enjoyed some good food at the Vale Inn, washed down with beer from their own brewery – well worth returning to.

We joined the community singing carols around the tree on Christmas eve.

A scrumptious turkey for Christmas day thanks to Heathcotes butchers, -definitely a place we’ll return to

We decided to spend New Year’s Eve on the boat and thanks to the aqueducts elevation, thought we’d enjoy the towns fireworks at midnight. The weather got the better of us and it was just too wet to be outside although as the celebrations continued for over an our not everyone was bothered. Personally I prefer early mornings to late nights.

New Year’s Day 2024 didn’t disappoint.

What better way to start a new year than a cruise.

The latest CRT update came through yesterday. The canal is still closed at Bridge 85 and the next update is on 10th January.
Happy New Year,








