Through the Tunnel and a bit of a scare.

The tomato soup (iron oxide ground seepage) was looking good as we pulled up at the tunnel entrance to await an unbooked passage. There was a boat coming south, so the gate keeper agreed we had plenty of time to fill up with water.

Making good use of our waiting time

And it gave me a chance to wander around and see the second tunnel

Brindley’s tunnel

The second tunnel was actually the first. Built by James Brindley as part of the initial canal structure in 1770. At 1.6 miles long, it was the longest tunnel on the network but its 7 year construction was fraught with engineering difficulties as the ground structure changed from soft earth to hard millstone grit. The tunnel was narrow and it took 2 men 3 hours to leg through. The boat kids walked the ponies over the top of the hill along Boathorse Lane. It was decided that the ecconomic value of the canal to the potteries warranted a second tunnel, this time built in 3 years by Thomas Telford. It was wide enough to accommodate a towing path, although the ponies still didnt like being underground for such a long time. Average transit time was now 90 minutes. Despite its limited capacity and frequent structural problems, Brindley’s tunnel remained in use until 1914 when it became uneconomical to repair. Telford’s tunnel also had its fair share of subsidence with the towpath sinking below water level. In 1914 electric tugs were used to haul the boats until the mid 50’s, when most boats had a diesel engine. Major repairs were needed in the 70’s so the authorities removed the towpath completely.
Nowadays it takes between 30 and 40 minutes to complete the passage. CRT operate a booking system, to manage the traffic, although there is still turn up and wait option from 10 until 2 each day (please check their website as these times change)
And we made it out the otherside.

Here be dragons

There’s a very convenient Lidl on the canalside just after the tunnel, so we moored up and I went off to restock the fridge. We had full sunshine and it fell safe and secure so we stayed put for the night. Besides I was busy trying to take photos of the ducklings.

If only they’d keep still for a good photo

Safe and secure we thought…. until the following morning when we fell out of bed, literally, and I do mean literally. The boat was listing at a horrible angle. It was barely light, but we realised that there had been a significant drop in the water level and we were hanging on with our ropes. What with last year’s Bridgewater Breach and this year’s Whitchurch Breach we were relieved not to see any water rushing past us, but even so, with a drop of two foot, that was significant. And yes we were quite worried.

That doesn’t look right

We could barely stand up inside, and things had slid onto the floor. Luckily no breakages. It was difficult to get off the boat with the combination of the level difference and angle.

And I dont like the look of that Armco either

But our first thought was that some *%&£@ had left the paddles up on the lock below us. We walked to both the locks above and below us and all the gates and paddles were closed, and the adjacent water levels seemed to be correct. It was only our pound between locks 45 and 46 that had lost water.

The angle the boat was at was a lot more scarey than it looks

The obvious solution was that we should simply run some water down from the pound above us, but what if this level drop were a structural incident or an imminent failure. At 6.30, having spoken to the other boater in the same plight as us, we decided to play the better safe than sorry card and call the CRT emergency line only to get a recorded, “all our operators are busy right now” message. Not even an option to leave a message. What would have happened if this had been a serious breach or real emergency, ok I’d have dialled 999 but even so what good is an unmanned emergency line. When I did get through at 7.30 . Stating we were moored between 45 and 46 on the Trent and Mersey, the operator, then asked “exactly where are you” …between locks 45 and 46 on the T&M… “and where’s that?”… Kidsgrove, near the harecastle tunnel…”I can’t find that on the map” ….Eventually, they located us, and said they’d contact the local team who would call us back. Come on CRT, forget installing fancy signage and food waste bins, how about a better map system for your operators. By now we were thoroughly cheesed off, worried and annoyed and other boaters were also chomping at the bit. By 9.30 some volunteers had turned up. And they did what we should possibly have done 3 hours earlier. They just opened up the lock and ran water through. We never got our call back. We have no idea if any investigation was done as to the cause of the water loss. They just patted us on the back and said someone must have left a paddle up. Of course I should really have filed a “near miss” complaint. The what ifs dont bear thinking about. And I’m not even going to think about the state of that Almco below water level. Out of sight out of mind.

That’s better, I can stand up straight now.

Once we were refloated we just escaped and worked our way down the next 5 locks and left them too it. We were going to enjoy a late brunch and some peace. Our emotions had been put through the wringer and we’d had enough for one day.

That’s more like it.

But it’s only 6 miles

….and 25 locks from the bottom lock at Wheelock to the top lock at Red Bull, Kidsgrove. No wonder it’s known as Heartbreak Hill. Even the summit of that big hill Everest is only 5.5miles above sea level, but I’ve more sense than to attempt that only carrying a windlass. Not to mention my dodgy logic.  We set off from Ettiley Heath at 7am so as to beat the heat.

Early morning mist at Ettiley Heath

The forecast was for the hottest day of the year so far, mid 20’s, so we only planned to cruise until 11 then find a tree to moor under.

Entering Wheelock Bottom Lock, the start of the flight

As per ususal we gave a big sigh of relief that our chosen mode of transport took us under the M6 and not along it. Although to be fair, the country would be a very different place if we still relied on the canals to get goods from A to B.

That caravan is nearly as long as Firecrest,

We found our tree after 12 locks and settled down to watch the world go by, except it didn’t, the canal is exceptionally quiet, only 6 boats in the whole day cruised past us.

Chells Hill

The next day was a lot busier, although some people had the right idea.

Wonder what they serve at the Red Bull pub?

We’d done the hill in 2 days, and it really wasn’t too bad. It’s a pretty section of canal and there’s several nice mooring places to break up the journey. Plan B had been to turn onto the Macclesfield canal here, but alas, due to the April breach we were now onto Plan C, travelling south. We topped up at the very convenient canal side Lidl, and set off through the tomato soup to go through the Harecastle Tunnel.

“Who said red and green should never be seen”

I didn’t manage to catch the skeleton on camera very well this transit, it must have been running away….

The Harecastle skeleton

or was it running to catch us, either way I wasn’t hanging around to find out. After 38 minutes underground we were happy to see the light at the end of the tunnel.

the end in sight

We moored up outside the Middleport Pottery to plan our next adventure

Tomato Soup, anyone?

We were in for a treat, our son Tim had the opportunity to join us for a few days. Ironically the last time we saw him was 8 months ago when he met us at Kidsgrove to travel south. Today he was arriving by bike so we booked our passage through the Harecastle tunnel for an afternoon transit. We said our goodbyes to Westport Lake, (built by the Victorians after a mine collapse)

Westport Lake

And set off to wait for him at the south portal. The original Harecastle tunnel was built by James Brindley and completed in 1777 but it was constantly beset by problems. I’m sure the original bargees didn’t like it as it would take them over three hours to leg through the 2630m. They would lie on their backs on the roof of their boats and walk sideways along the walls, not easy and hard work. The children walked the horses over the hill on the aptly named Boathorse Road. 50 years later Thomas Telford built a second, bigger tunnel that included a towpath, which greatly reduced transit time. But it was still a difficult tunnel to pass through. In the 1970’s the Towpath was removed, and now apart from it being long cold and drippy, it’s fairly straightforward. There is an interesting page on Wikipedia about the two tunnels. https://en.m.wikipedia.org/wiki/Harecastle_Tunnel

The old 1770’s and the new, 1820’s.


Although there’s a booking system in place, the tunnel keepers seem to exercise a degree of common sense and as Tim arrived earlier than expected we joined the last morning convoy. We dutifully paid our respects to the boater who didn’t obey the rules.

Mr Bones looking a bit shaky today

And emerged after about 45 minutes, in time for a bowl of tomato soup for lunch.

Happy to see daylight again on the north side of the tunnel

Ok I’m only joking, the canal isn’t really full of tomato soup, it’s the iron ore deposits leaking out of the older tunnel that discolour the water here. It always feels a bit chaotic around Kidsgrove, there are excited boaters waiting to use the tunnel, a lot of long term moorings, and bends and bridges and junctions to negotiate. But we were following the signs and headed south onto the Hall Green Branch on the Macclesfield Canal

We’ll be heading towards Whaley Bridge

Within half a mile we felt like we had emerged into a different world as the Hall Green Branch crosses over the Trent and Mersey on an aqueduct,

Looking down from the aqueduct

and we arrived at the Stop lock. This was a good one for Tim to practice on as the difference is only 6 inches. In the days when companies owned individual canals stop locks were put in place to force the boaters to stop and pay their dues.

We had to look hard to decide whether we were going up or down this lock.

3 happy boaters heading north on the Macclesfield Canal

Tim Eric and Cheryl

Haring through the Harecastle tunnel

Isn’t it just typical when we have an obligation to travel, the weather is poor. We set off in murky drizzle to do the last half a mile. No wonder the water had turned rusty red with the iron deposits. We always chuckle as we pass under the motorway bridges, this time we were passing underneath the Macclesfield Canal just before the junction. It would have been fun to see a narrowboat above us, but at 7am only the foolhardy were on the move.

Passing under the Macclesfield Canal aqueduct

It was June 2017 that we emerged from the Macclesfield Canal onto the T&M, and I have a feeling it was raining that day as well

The start, or end of the Macclesfield Canal

We carry a spare life jacket so Tim was able to comply with the safety guidelines and as it was raining heavily by now, we didn’t waste much time outside chatting to the CRT crew. We were the third of five to go through on the 8am passage.

Looks like we’ll fit

It’s the second longest tunnel on the network, 2657m long (1.6miles) traffic is one way, and although it is always manned, it doesn’t usually need to be booked in advance, but they want to avoid the potential log jam of boaters awaiting their turn. They let several boats through in a convoy, and count them in and out. It’s not unheard of for boats to break down in the tunnel, and not very easy for them to be rescued. Not everyone makes it out……

The resident skeleton who lives inside the tunnel

But thankfully we did, it took us exactly 40 minutes, 10 minutes longer than the first time.

Almost through

Tim was to catch the train home from Stoke so because the rain was now torrential we moored up and enjoyed a cooked breakfast, but by the time we had washed up, the weather had improved, so the next 5 locks were ok. This section of canal is going downhill so the locks are a bit easier to work.

It turned out to be a good day after all